I've actually had some good time to work on the trains this past week and weekend.  Got a ton of track put down.  Feeling good but, of course, my lovely wife has thrown a huge wrench into the gears with a change of plans on where the layout can go!  More on that later.

So my progress report -

Screwed down the KW side of the layout.  Which sounds easy, but was a bit mental fight as I have the electronics drawer underneath it.  Access going forward is limited to the front two thirds.  Which, if I planned correctly should be fine.  The back third of the drawer is power distro, the Digitrax chief, my PR-3 and a bit of the TC-64.  There's no looking back now !

With the help of my 3 year old son, got a lot done.  He enjoyed using the tweezers to pick up small objects, not so much with the actual help.  Small steps, small steps !


I completed the entire KW yard, and Waterloo is connected to it.  Picture is above.  Added a couple notes about what's going where, possibly.  The only definite is the KW Station in the yard.  This will service GO Transit and VIA Rail.

Notice my mainline is elevated from the spurs and yard.  Got this idea from everyone else...

KW yard to the left, storage and roundabout tracks to the right

Connection from Waterloo to KW is the middle line, the engine is on  the Elmira spur
Of course with all the track work down it allowed me to test it out.  Have to add a few more power feeders, less than I thought actually.  It all seemed to work pretty well.   Next step is to wire up all the servo's and then watch for derailments with my most finicky cars.

Next blog will go into the big change of plans !